Master Bathroom Remodeling Pembroke Pine

3 beds - 2 full bath

House

1997

Build Year

2,100 Sq Ft

Surface Area

 The original design of the Master Bathroom was old, not very functional and did not allow to enjoy the spaciousness of the bathroom, greatly limiting the spaces.

DESIGN PROCESS

The main objective is to achieve the integration of the areas with a modern concept. The Architect, part of the GANDARA Construction team, proposed locating the closets between the Master Bedroom and the Master Bathroom. Relocating the toilet and bathtub, conceiving a double vanity next to the window to take advantage of natural lighting.

REMODELING GOAL

The remodeling included building a new Master Bathroom, relocating the sanitary and water pipes, new partitions with a new ceiling, new position of the air conditioning grilles and a new exhaust fan. The lighting system would be modified with high hats and relocate the outlets and swifts in the bathroom. In short, the remodeling of the bathroom required the intervention of all specialties: plumbing, mechanics, electricity and civil.

HOW WE STARTED?

We started with the design proposal for the new Master Bathroom and their integration into the space

Here is the Rendering result after talking with the owner and design a funtional bathroom that will have all their clients needs.

CONSTRUCTION PROCESS

Demolition work

plumbing work

Mechanical, Electrical and civil works:

The duration of the job was 4 weeks, working 8 hours from Monday to Friday.

FINAL RESULTS

WG Construction served as a Certified General Contractor in the State of Florida, taking charge of the design, sketch, plans, and calculations, the Master Permit with the Town of Miami Dade, and the execution of the entire Project.