DESIGN PROCESS
The main objective is to achieve the integration of the areas with a modern concept. The Architect, part of the GANDARA Construction team, proposed locating the closets between the Master Bedroom and the Master Bathroom. Relocating the toilet and bathtub, conceiving a double vanity next to the window to take advantage of natural lighting.
REMODELING GOAL
The remodeling included building a new Master Bathroom, relocating the sanitary and water pipes, new partitions with a new ceiling, new position of the air conditioning grilles and a new exhaust fan. The lighting system would be modified with high hats and relocate the outlets and swifts in the bathroom. In short, the remodeling of the bathroom required the intervention of all specialties: plumbing, mechanics, electricity and civil.
WG Construction served as a Certified General Contractor in the State of Florida, taking charge of the design, sketch, plans, and calculations, the Master Permit with the Town of Miami Dade, and the execution of the entire Project.