DESIGN PROCESS
The main objective is to achieve the integration of the areas with a modern concept, within an existing conservative interior decoration where golden accents predominated. The open concept wanted to achieve total integration with the design by introducing an interior with greater lighting and perfect interrelation between the spaces.
REMODELING GOAL
The remodeling implicitly brought some challenges, such as that the floor had been recently renovated and the owners did not want to change it again, the owners wanted to avoid odors during the cooking process, which implied a good extraction system. And last but not least, the owners wanted the ceiling repaired, but this repair was almost perfect, with the same existing texture, to avoid repairing the entire ceiling.
WG Construction served as a Certified General Contractor in the State of Florida, taking charge of the design, sketch, plans, and calculations, the Master Permit with the Town of Miami Dade, and the execution of the entire Project.