REMODELING GOAL:
This is a property recently bought by the young owners to start a new family in a new home for their children in an excellent neighborhood in Miami.
Basically the goal of the interior remodeling is to modernize the property: with a new air conditioning system, new electrical system including an electrical panel and a new plumbing system to replace the cast iron drain pipes. All of the above will allow us to later remodel the bathrooms, the kitchen, install a new ceiling with a modern lighting system and restore the existing terrazzo in the property.
DESIGN PROCESS
In the integration of the process design, it was required to define the design of the kitchen and bathrooms to begin to define the CPVC drainage system which we proposed to do through the terrace until it was connected to the existing CPVC clean out.
With the floor plan defining the plumbing system that would cause the least damage to the existing terrazzo and that the owners wish to restore, we could begin to define the lighting along with the linear grids that we would use in the design
CONSTRUCTION PROCESS
DEMOLITION WORK

PLUMBING WORK

MECHANICAL WORK
Toggle Content goes here
ELECTRICAL WORK
Toggle Content goes here
INSULATION
Toggle Content goes here
BATH
WOOD CARPENTRY
KITCHEN
PAINTING
WG Construction served as a Certified General Contractor in the State of Florida, taking charge of the design, sketch, plans, and calculations, the Master Permit with the Town of Miami Dade, and the execution of the entire Project.